A Two-Step Approach to Maximizing Throughput and Minimizing Processing Time in Flexible Manufacturing Systems
dc.contributor.author | Mgwatu, Mussa I. | |
dc.date.accessioned | 2016-03-16T07:50:54Z | |
dc.date.available | 2016-03-16T07:50:54Z | |
dc.date.issued | 2009 | |
dc.identifier.citation | M. I. Mgwatu (2009), A Two-Step Approach to Maximizing Throughput and Minimizing Processing Time in Flexible Manufacturing Systems, In Proceedings of the American Society for Engineering Education (ASEE) Northeast Conference, Bridgeport, Connecticut, USA, April 3-4, 2009 | en_US |
dc.identifier.uri | http://hdl.handle.net/123456789/984 | |
dc.language.iso | en | en_US |
dc.publisher | American Society for Engineering Education | en_US |
dc.subject | Maximizing | en_US |
dc.subject | Processing Time | en_US |
dc.subject | flexible manufacturing systems | en_US |
dc.title | A Two-Step Approach to Maximizing Throughput and Minimizing Processing Time in Flexible Manufacturing Systems | en_US |
dc.type | Conference Proceedings | en_US |