Alternative process flow for underground mining operations: analysis of conceptual transport methods using discrete event simulation

dc.contributor.authorGreberg, Jenny
dc.contributor.authorSalama, Abubakary
dc.contributor.authorGustafson, Anna
dc.contributor.authorSkawina, Bartlomiej
dc.date.accessioned2020-03-18T13:26:26Z
dc.date.available2020-03-18T13:26:26Z
dc.date.issued2016-09
dc.description.abstractAs the near surface deposits are being mined out, underground mines will increasingly operate at greater depths. This will increase the challenges related to transporting materials from deeper levels to the surface. For many years, the ore and waste transportation from most deep underground mines has depended on some or all of the following: truck haulage, conveyor belts, shafts, rails, and ore pass systems. In sub-level caving, and where ore passes are used, trains operating on the main lower level transport the ore from ore passes to a crusher, for subsequent hoisting to the surface through the shaft system. In many mines, the use of the ore pass system has led to several problems related to the ore pass availability, causing production disturbances and incurred cost and time for ore pass rehabilitation. These production disturbances have an impact on the mining activities since they increase the operational costs, and lower the mine throughput. A continued dependency on rock mass transportation using ore passes will generate high capital costs for various supporting structures such as rail tracks, shaft extensions, and crushers for every new main level. This study was conducted at an existing underground mine and analyzed the transport of ore from loading areas at the lower levels up to the existing shaft points using trucks without employing ore passes. The results show that, when the costs of extending ore passes to lower levels become too great or ore passes cannot be used for production, haul trucks can be a feasible alternative method for transport of ore and waste up the ramp to the existing crusher located at the previous main level. The use of trucks will avoid installing infrastructure at the next main level and extending the ore passes to lower levels, hence reducing costsen_US
dc.description.sponsorshipI2 MINE PROJECT UNDER EU 7TH FRAMEWORK PROGRAMMEen_US
dc.identifier.doihttps://doi.org/10.3390/min6030065
dc.identifier.urihttp://hdl.handle.net/20.500.11810/5393
dc.language.isoenen_US
dc.publisherMDPIen_US
dc.subjectrock mass transportation; haulage system; trucks; ore pass; discrete event simulation; sub-level cavingen_US
dc.titleAlternative process flow for underground mining operations: analysis of conceptual transport methods using discrete event simulationen_US
dc.typeJournal Articleen_US
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
minerals-06-00065 (1).pdf
Size:
2.06 MB
Format:
Adobe Portable Document Format
Description:
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: